Warehouse and Industrial Aisle Control on Existing Circuits
Aisle lighting, loading-area circuits, ventilation and equipment on/off control sit far apart in a warehouse, and running new control cable across a live facility is disruptive. A local-first LoRa architecture links schedules and inputs to switches and keeps operational controls available when remote links fail.
Site constraints
Long runs across a live facility
Lighting and equipment are spread across aisles and a loading area, usually far from the panel room. Adding new control cable means working around live operations and, quite often, taking a zone out of service to do it.
Dense steel and racking
Steel racking, stacked goods and concrete attenuate radio links. Reach depends on the antenna, the mounting height, the racking layout, the enclosure and the survey, so link planning is a per-aisle decision rather than a single site figure.
Operational and safety circuits are mixed
Ventilation, equipment control and some fire-related or safety circuits sit close together but are not the same thing. Circuits that must not be switched remotely have to be identified and excluded before the design is fixed.
How the system is arranged
Gateway in the technical room
A gateway or edge controller sits in a cabinet near the existing distribution. Switches and controllers sit on the aisle, ventilation and equipment circuits and talk to it over LoRa, avoiding a new control run across the building.
Required, optional and degraded behaviour
Required: the edge controller stays on site and the local schedule and rule engine runs on it. Aisle lighting and equipment control continue without an uplink.
Optional: cloud management, trend history and documented integration with systems such as Modbus or BACnet are added where the facility already runs them.
Degraded: if the uplink drops, reporting and remote dashboards pause while local control continues. If the edge controller loses power, the affected circuits fall back to their defined fail states.
Linking inputs from existing systems
Occupancy and safety inputs can trigger local rules, but only through interfaces that are documented for the selected model. Anything not documented is treated as out of scope rather than assumed to work.
What you can verify
- Fewer control cable runs across aisles and the loading area, so less disruption to live operations.
- Schedules and local rules continue through an uplink outage.
- Fault localisation to a single circuit or aisle rather than a whole zone.
- Documented integration with existing BMS or Modbus systems where they are present.
- Zone-by-zone rollout, so each aisle can be migrated as operations allow.
Who is involved on site
Systems integrator
Documented interfaces and a local rule engine so lighting and equipment control link cleanly to an existing facility system.
Site operator or facilities team
Schedules that keep aisle and loading-area lighting predictable, and a clear boundary around circuits that must not be switched remotely.
Electrical contractor or installer
Mounting and enclosure choices for an industrial environment, and defined fail states for each circuit.
Pre-specification checklist
- Aisle and zone layout, including racking heights and the loading area.
- Supply and load for each circuit, including ventilation and any motor circuits.
- Which circuits are safety-related and must not be switched remotely.
- Panel locations and the space available for a gateway or edge controller.
- Existing systems and the interfaces to be integrated, with their documentation.
- Which rules must act locally with no uplink at all.
- The target radio band and any local radio rules that apply to the site.
Supported SKUs
Availability in your market — Global (English)
Not currently offered in this market
Radio authorisation, electrical approvals or an authorised importer are not in place for this destination. We will confirm the compliance path when you enquire.
Availability follows the market pack, not the language you are reading.
| Model | Radio band | Maximum load | Supply voltage | Status |
|---|---|---|---|---|
| LS-DIN-4CH4-channel LoRa DIN controller, EU868 | EU868 | 10 A | 230 V | inquirable |
| LS-RC-16ADIN-rail LoRa relay controller, 16 A, EU868 | EU868 | 16 A | 230 V | inquirable |
| LS-RC-25ADIN-rail LoRa relay controller, 25 A, EU868 | EU868 | 25 A | 230 V | concept |
| LS-GW-300LoRa edge controller, multi-protocol, EU868 | EU868 | 0.8 A | 12 / 24 V | concept |
| LS-SN-MTLoRa occupancy sensor, EU868 | EU868 | 0.05 A | 3 V | concept |
Next steps
Send this first
Send the zone layout, the circuit and load list and the integration notes above through the site-fit request. A first response confirms which aisles look feasible by radio and where a survey is needed.
What happens next
We return a feasibility note covering controller siting, the proposed radio layout, the documented interfaces and any point needing a site visit. A confirmed specification and supported SKU list follow the survey, with the conditions each claim depends on.