Current release notes
What this documentation revision covers, what has changed since the previous revision, and why no firmware version identifier is listed until it has been released.
| Document revision | r0.1-draft |
|---|---|
| Status | draft |
| Applies to | LS-WS-1G, LS-WS-2G, LS-WS-3G, LS-RC-16A, LS-RC-25A, LS-DIN-4CH, LS-GW-100, LS-GW-300, LS-SN-TH, LS-SN-MT |
| Regions | global |
| Published | Oct 15, 2026 |
| Review due | Apr 15, 2027 |
| Author | Engineering documentation (owner unassigned) |
| Reviewer | Engineering sign-off pending (reviewer unassigned) |
Release notes record what changed and what it affects. This is the first revision of the set, so it records the position of the set rather than a change from a predecessor. This page will not list a firmware version until that firmware has been released and its applicability to a model has been checked.
Revision status
This is revision r0.1-draft, status draft. Every document in the set shares this position: the structure, method and limits are written, and the measured values that would normally fill the specification lines are held back pending engineering sign-off. A document that cannot be verified is not published as if it were.
What this revision establishes
- The reading order and the versioning rule for the set: applicability is per document, and a document's revision is checked before its procedure is followed.
- The commissioning sequence, the coverage survey method and the local-first proof, each stated as method rather than as numbers.
- The interface position: the contract shape is described, and the authoritative field list is delegated to
contracts/openapi.yaml, owned by a second team. - The compliance position: radio and electrical routes are described, and identifiers are withheld until issued for a specific model and market.
What is pending
The following are intentionally absent from this revision and will appear in a later revision, each with the revision it applies to:
- Measured electrical, radio and environmental values for each model — they will be published on the model pages and referenced here.
- Concrete firmware version identifiers and their applicability.
- Certificate identifiers, issuing bodies and per-market authorisation statements.
- The concrete interface artefacts: resource paths, problem-type catalogue and field-bus maps.
Placeholder — pending engineering sign-off: the release date and identifier of the next revision, and the list of documents it will change, are not published yet.
Failure modes
- A procedure followed on the wrong revision: compare this page's revision against the badge on the document you are reading; a mismatch means one of them is stale.
- A pending value treated as published: anything marked as pending is not a specification. Nothing in this set should be measured from a placeholder.
Limitations
- This page carries no version number for any firmware or hardware. A release note without a checked release is worse than none, so the identifiers arrive with the release.
- The set is English-only. A translation would have to be reviewed against the same revision before it could exist, and no such review has happened.
What this document does not cover: the update procedure that will accompany a future release is in Firmware update, and the market rules that decide where a release may be offered are in Radio and electrical routes.